04 Project Integration Management
05 Project Scope Management
06 Project Schedule Management
07 Project Cost Management
08 Project Quality Management
09 Project Resource Management
10 Project Communications Management
11 Project Risk Management
12 Project Procurement Management
13 Project Stakeholder Management
PMI Project Management Body of Knowledge (PMBOK V6)
Initiation Group - Gate 1
04.1Develop Project Charter
Inputs
Enterprise environmental factors
Organizational process assets
Agreements
Business documents
Benefits management plan
Business case
Outputs
Project charter
Project purpose;
Measurable project objectives and related success criteria;
High-level requirements;
High-level project description,
High-level boundaries,
key deliverables;
High leve/milestone schedule;
Preapproved financial resources/budget
Key stakeholder list;
Overall project risk;
Project approval requirements
Project exit criteria
Assigned project manager
Sponsor
Assumption log
Tools & Techniques
Data gathering
Brainstorming
Focus groups
Interviews
Expert judgment
Interpersonal and team skills
Conflict management
Facilitation
Meeting management
Meetings
04 Project Integration Management
..
13.1 Identify Stakeholder
Inputs
Enterprise environmental factors
Organizational process assets
Agreements
Business documents
Benefits management plan
Business case
Project charter
Project documents
Change log
Issue log
Requirements documentation
Project management plan
Communications management plan
Stakeholder engagement plan
Outputs
Change requests
Project documents updates
Assumption log
Issue log
Risk register
Project management plan updates
Communications management plan
Requirements management plan
Risk management plan
Stakeholder engagement plan
Stakeholder register
Tools & Techniques
Data analysis
Document analysis
Stakeholder analysis
Data gathering
Brainstorming
Questionnaires and surveys
Data representation
Stakeholder mapping/ representation
Expert judgment
Meetings
13 Project Stakeholder Management
Planning Group- Gate 2
04.2Develop Project Management Plan
Inputs
Enterprise environmental factors
Organizational process assets
Outputs from other processes
Project charter
Outputs
Project management plan
10 plans + 3 baseline
performance measurement baseline
Project Lifecycle description
Development approach
Tools & Techniques
Data gathering
Brainstorming
Checklists
Focus groups
Interviews
Expert judgment
Interpersonal and team skills
Conflict management
Facilitation
Meeting management
Meetings
04 Project Integration Management
05.1Plan Scope Management
Inputs
Enterprise environmental factors
Organizational process assets
Project charter
Project management plan
Development approach
Project life cycle description
Quality management plan
Outputs
Requirements management plan
Scope management plan
Tools & Techniques
Data analysis
Alternatives analysis
Expert judgment
Meetings
05.2Collect Requirements
Inputs
Enterprise environmental factors
Organizational process assets
Project management plan
Requirements management plan
Scope management plan
Stakeholder engagement plan
Project documents
Assumption log
Lessons learned register
Stakeholder register
Agreements
Business documents
Business case
Project charter
Outputs
Requirements documentation
Requirements traceability matrix
Tools & Techniques
Context diagram
Data analysis
Document analysis
Data gathering
Benchmarking
Brainstorming
Focus groups
Interviews
Questionnaires and surveys
Data representation
Affinity diagrams
Mind mapping
Decision making
Multicriteria decision analysis
Voting
Expert judgment
Interpersonal and team skills
Facilitation
Nominal group technique
Observation/conversation
Prototypes
05.3Define Scope
Inputs
Enterprise environmental factors
Organizational process assets
Project management plan
Scope management plan
Project documents
Assumption log
Requirements documentation
Risk register
Project charter
Outputs
Project documents updates
Assumption log
Requirements documentation
Requirements traceability matrix
Stakeholder register
Project scope statement
Tools & Techniques
Data analysis
Alternatives analysis
Decision making
Multicriteria decision analysis
Expert judgment
Interpersonal and team skills
Facilitation
Product analysis
05.4Create WBS
Inputs
Enterprise environmental factors
Organizational process assets
Project management plan
Scope management plan
Project documents
Project scope statement
Requirements documentation
Outputs
Project documents updates
Assumption log
Requirements documentation
Scope baseline
Approved version of a scope statement
The project scope statement includes the description of the project scope, major deliverables, assumptions, and constraints
WBS
WBS dictionary
Work package:The lowest level of the WBS is a work package with a unique identifier.
Planning package. A control account may include one or more planning packages. A planning package is a work breakdown structure component below the control account and above the work package with known work content but without detailed schedule activities.
Tools & Techniques
Decomposition
Expert judgment
05 Project Scope Management·
06.1Plan Schedule Management
Inputs
Enterprise environmental factors
Organizational process assets
Project management plan
Development approach
Scope management plan
Project charter
Outputs
Schedule management plan
Tools & Techniques
Data analysis
Alternatives analysis
Expert judgment
Meetings
06.2Define Activities
Inputs
Enterprise environmental factors
Organizational process assets
Project management plan
Schedule management plan
Scope baseline
Outputs
Activity attributes
Activity list
Change requests
Milestone list
Project management plan updates
Cost baseline
Schedule baseline
Tools & Techniques
Decomposition
Expert judgment
Meetings
Rolling wave planning
06.3Sequence Acttivitties
Inputs
Enterprise environmental factors
Organizational process assets
Project management plan
Schedule management plan
Scope baseline
Project documents
Activity attributes
Activity list
Assumption log
Milestone list
Outputs
Project documents updates
Activity attributes
Activity list
Assumption log
Milestone list
Project schedule network diagrams
Tools & Techniques
Dependency determination and integration
Leads and lags
Precedence diagramming method
Project management information system
06.4Estimate Activity Durations
Inputs
Enterprise environmental factors
Organizational process assets
Project management plan
Schedule management plan
Scope baseline
Project documents
Activity attributes
Activity list
Assumption log
Lessons learned register
Milestone list
Project team assignments
Resource breakdown structure
Resource calendars
Resource requirements
Risk register
Outputs
Duration estimates
Basis of estimates
Project documents updates
Activity attributes
Assumption log
Lessons learned register
Tools & Techniques
Analogous estimating
Bottom-up estimating
Parametric estimating
Three-point estimating
Data analysis
Alternatives analysis
Reserve analysis
Expert judgment
Meetings
Decision making
06.5Develop Schedule
Inputs
Enterprise environmental factors
Organizational process assets
Project management plan
Schedule management plan
Scope baseline
Project documents
Activity attributes
Activity list
Assumption log
Basis of estimates
Duration estimates
Lessons learned register
Milestone list
Project schedule network diagrams
Project team assignments
Resource calendars
Resource requirements
Risk register
Agreements
Outputs
Change requests
Project calendars
Project management plan updates
Cost baseline
Schedule management plan
Project documents updates
Activity attributes
Assumption log
Risk register
Duration estimates
Lessons learned register
Resource requirements
Project schedule
Schedule baseline
Schedule data
Tools & Techniques
Agile release planning
Critical path method
Schedule network analysis
Leads and lags
Schedule compression
Resource optimization
Data analysis
Simulations
What-if scenario analysis
Project management information system
06 Project Schedule Management
07.1Plan Cost Management
Inputs
Enterprise environmental factors
Organizational process assets
Project management plan
Risk management plan
Schedule management plan
Project charter
Outputs
Cost management plan
Tools & Techniques
Data analysis
Alternatives analysis
Expert judgment
Meetings
07.2Estimate Costs
Inputs
Enterprise environmental factors
Organizational process assets
Project management plan
Cost management plan
Quality management plan
Scope baseline
Project documents
Lessons learned register
Project schedule
Resources requirements
Risk register
Outputs
Cost estimates
Basis of estimates
Project documents updates
Assumption log
Lessons learned register
Risk register
Tools & Techniques
Analogous estimating
Bottom-up estimating
Data analysis
Alternatives analysis
Cost of quality
Reserve analysis
Decision making
Voting
Expert judgment
Parametric estimating
Project management information system
Three-point estimating
07.3Determine Budget
Inputs
Enterprise environmental factors
Organizational process assets
Project management plan
Cost management plan
Resource management plan
Scope baseline
Project documents
Basis of estimates
Cost estimates
Project schedule
Risk register
Agreements
Business documents
Benefits management plan
Business case
Outputs
Cost baseline
Project documents updates
Cost estimates
Project schedule
Risk register
Project funding requirements
Tools & Techniques
Cost aggregation
Data analysis
Reserve analysis
Expert judgment
Financing
Funding limit reconciliation
Historical information review
07 Project Cost Management·
08.1Plan Quality Management
Inputs
Enterprise environmental factors
Organizational process assets
Project management plan
Requirements management plan
Risk management plan
Scope baseline
Stakeholder engagement plan
Project documents
Assumption log
Requirements documentation
Requirements traceability matrix
Risk register
Stakeholder register
Project charter
Outputs
Project documents updates
Lessons learned register
Requirements traceability matrix
Risk register
Stakeholder register
Project management plan updates
Risk management plan
Scope baseline
Quality management plan
Quality metrics
Tools & Techniques
Data analysis
Cost of quality
Cost-benefit analysis
Data gathering
Benchmarking
Brainstorming
Interviews
Data representation
Flowcharts
Logical data model
Matrix diagrams
Mind mapping
Decision making
Multicriteria decision analysis
Expert judgment
Meetings
Test and inspection planning
08 Project Quality Management
09.1Plan Resource Management
Inputs
Enterprise environmental factors
Organizational process assets
Project charter
Project documents
Project schedule
Requirements documentation
Risk register
Stakeholder register
Project management plan
Quality management plan
Scope baseline
Outputs
Project documents updates
Assumption log
Risk register
Resource management plan
Team charter
Tools & Techniques
Data representation
Hierarchical charts
Responsibility assignment matrix
Text-oriented formats
Expert judgment
Meetings
Organizational theory
09.2Estimate Activity Resources
Inputs
Enterprise environmental factors
Organizational process assets
Project management plan
Resource management plan
Scope baseline
Project documents
Activity attributes
Activity list
Assumption log
Cost estimates
Resource calendars
Risk register
Outputs
Basis of estimates
Project documents updates
Activity attributes
Assumption log
Lessons learned register
Resource breakdown structure
ReBS
Resource requirements
Tools & Techniques
Analogous estimating
Bottom-up estimating
Parametric estimating
Data analysis
Alternatives analysis
Expert judgment
Meetings
Project management information system
09 Project Resource Management
10.1Plan Communications Management
Inputs
Enterprise environmental factors
Organizational process assets
Project management plan
Resource management plan
Stakeholder engagement plan
Project documents
Requirements documentation
Stakeholder register
Project charter
Outputs
Communications management plan
Project management plan updates
Project schedule
Stakeholder register
Project documents updates
Stakeholder engagement plan
Tools & Techniques
Communication methods
Communication models
Communication requirements analysis
Communication technology
Data representation
Stakeholder engagement assessment matrix
Expert judgment
Interpersonal and team skills
Communication styles assessment
Cultural awareness
Political awareness
Meetings
10 Project Communications Management
11.1Plan Risk Management
Inputs
Enterprise environmental factors
Organizational process assets
Project management plan
Project documents
Stakeholder register
Project charter
Outputs
Risk management plan
Tools & Techniques
Data analysis
Stakeholder analysis
Expert judgment
Meetings
11.2Identtify Risks
Inputs
Enterprise environmental factors
Organizational process assets
Project management plan
Cost baseline
Schedule baseline
Scope baseline
Requirements management plan
Schedule management plan
Cost management plan
Quality management plan
Resource management plan
Risk management plan
Project documents
Assumption log
Cost estimates
Duration estimates
Issue log
Lessons learned register
Requirements documentation
Resource requirements
Stakeholder register
Agreements
Procurement documentation
Outputs
Project documents updates
Assumption log
Issue log
Lessons learned register
Risk register
Risk report
Tools & Techniques
Data analysis
Assumption and constraint analysis
Document analysis
Root cause analysis
SWOT analysis
Data gathering
Brainstorming
Checklists
Interviews
Expert judgment
Interpersonal and team skills
Facilitation
Meetings
Prompt lists
11.3Perform Qualitative Risk Analysis
Inputs
Enterprise environmental factors
Organizational process assets
Project management plan
Risk management plan
Project documents
Assumption log
Risk register
Stakeholder register
Outputs
Project documents updates
Assumption log
Issue log
Risk register
Risk report
Tools & Techniques
Data analysis
Assessment of other risk parameters
Risk data quality assessment
Risk probability and impact assessment
Data gathering
Interviews
Data representation
Hierarchical charts
Probability and impact matrix
Expert judgment
Interpersonal and team skills
Facilitation
Meetings
Risk categorization
11.4Perform Quantitative Risk Analysis
Inputs
Enterprise environmental factors
Organizational process assets
Project management plan
Scope baseline
Schedule baseline
Cost baseline
Risk management plan
Project documents
Assumption log
Basis of estimates
Cost estimates
Cost forecasts
Duration estimates
Milestone list
Resource requirements
Risk register
Risk report
Schedule forecasts
Outputs
Project documents updates
Risk report
Tools & Techniques
Data analysis
Decision tree analysis
Influence diagrams
Sensitivity analysis
Simulations
Data gathering
Interviews
Expert judgment
Interpersonal and team skills
Facilitation
Representations of uncertainty
11.5Plan Risk Responses
Inputs
Enterprise environmental factors
Organizational process assets
Project management plan
Cost baseline
Resource management plan
Risk management plan
Project documents
Lessons learned register
Project schedule
Project team assignments
Resource calendars
Risk register
Risk report
Stakeholder register
Outputs
Change requests
Project management plan updates
Cost baseline
Cost management plan
Procurement management plan
Quality management plan
Resource management plan
Schedule baseline
Schedule management plan
Scope baseline
Project documents updates
Assumption log
Cost forecasts
Project schedule
Project team assignments
Lessons learned register
Risk register
Risk report
Tools & Techniques
Contingent response strategies
Data analysis
Alternatives analysis
Cost-benefit analysis
Data gathering
Interviews
Decision making
Multicriteria decision analysis
Expert judgment
Interpersonal and team skills
Facilitation
Strategies for opportunities
Strategies for overall project risk
Strategies for threats
11 Project Risk Management
12.1Plan Procurement Management
Inputs
Enterprise environmental factors
Organizational process assets
Project management plan
Quality management plan
Resource management plan
Scope baseline
Scope management plan
Project documents
Milestone list
Project team assignments
Requirements documentation
Requirements traceability matrix
Resource requirements
Risk register
Stakeholder register
Business documents
Benefits management plan
Business case
Project charter
Outputs
Organizational process assets updates
Procurement management plan
Procurement statement of work
Procurement strategy
Independent cost estimates
Make-or-buy decisions
Bid documents
Source selection criteria
Project documents updates
Lessons learned register
Milestone list
Requirements documentation
Requirements traceability matrix
Risk register
Stakeholder register
Change requests
Tools & Techniques
Data analysis
Make-or-buy analysis
Data gathering
Market research
Expert judgment
Meetings
Source selection analysis
12 Project Procurement Management
13.2Plan Stakeholder Engagement
Inputs
Enterprise environmental factors
Organizational process assets
Project management plan
Communications management plan
Risk management plan
Resource management plan
Project documents
Assumption log
Change log
Issue log
Project schedule
Risk register
Stakeholder register
Agreements
Project charter
Outputs
Stakeholder engagement plan
Tools & Techniques
Data analysis
Assumption and constraint analysis
Root cause analysis
Data gathering
Benchmarking
Data representation
Mind mapping
Stakeholder engagement assessment matrix
Decision making
Prioritization/ranking
Expert judgment
Meetings
13 Project Stakeholder Management
Execution Group - Gate 3
04.3Direct and Manage Project Work
Inputs
Enterprise environmental factors
Organizational process assets
Project management plan
Project documents
Requirements traceability matrix
Milestone list
Project schedule
Project communications
Risk register
Risk report
Change log
Lessons learned register
Approved change requests
Outputs
Project management plan updates
Project documents updates
Requirements documentation
Activity list
Assumption log
Lessons learned register
Risk register
Issue log
Stakeholder register
Organizational process assets updates
Change requests
Work performance data
To be processed in 'Controlling' sub processes
Deliverables
Tools & Techniques
Expert judgment
Meetings
Project management information system
04.4Manage Project Knowledge
Inputs
Enterprise environmental factors
Organizational process assets
Project management plan
Project documents
Lessons learned register
Project team assignments
Resource breakdown structure
Source selection criteria
Stakeholder register
Deliverables
Outputs
Organizational process assets updates
Lessons learned register
Project management plan updates
Tools & Techniques
Expert judgment
Information management
Interpersonal and team skills
Active listening
Facilitation
Leadership
Networking
Political awareness
Knowledge management
04 Project Integration Management
08.2Manage Quality
Inputs
Organizational process assets
Project management plan
Quality management plan
Project documents
Lessons learned register
Quality control measurements
Quality metrics
Risk report
Outputs
Project management plan updates
Cost baseline
Quality management plan
Schedule baseline
Scope baseline
Project documents updates
Issue log
Lessons learned register
Risk register
Change requests
Quality reports
质量报告:可以包含:团队上报的质量管理问题,针对过程、项目和产品的改善建议,以及在控制质量过程中发现的情况概述
Test and evaluation documents
Tools & Techniques
Audits
审计
Data analysis
Alternatives analysis
Document analysis
Process analysis
Root cause analysis
Data gathering
Checklists
Data representation
Affinity diagrams
Cause-and-effect diagrams
Flowcharts
Histograms
Matrix diagrams
Scatter diagrams
Decision making
Multicriteria decision analysis
Design for X
Problem solving
Quality improvement methods
08 Project Quality Management
09.3Acquire Resources
Inputs
Enterprise environmental factors
Organizational process assets
Project management plan
Cost baseline
Procurement management plan
Resource management plan
Project documents
Project schedule
Resource calendars
Resource requirements
Stakeholder register
Outputs
Enterprise environmental factors updates
Organizational process assets updates
Project management plan updates
Cost baseline
Resource management plan
Project documents updates
Lessons learned register
Project schedule
Resource breakdown structure
Resource requirements
Risk register
Stakeholder register
Change requests
Physical resource assignments
Project team assignments
Resource calendars
Tools & Techniques
Decision making
Multicriteria decision analysis
Interpersonal and team skills
Negotiation
Pre-assignment
Virtual teams
09.4Develop Team
Inputs
Enterprise environmental factors
Organizational process assets
Project management plan
Resource management plan
Project documents
Lessons learned register
Project schedule
Project team assignments
Resource calendars
Team charter
Outputs
Enterprise environmental factors updates
Organizational process assets updates
Project management plan updates
Resource management plan
Project documents updates
Lessons learned register
Project schedule
Project team assignments
Resource calendars
Team charter
Change requests
Team performance assessments
Tools & Techniques
Colocation
Communication technology
Individual and team assessments
Interpersonal and team skills
Conflict management
Influencing
Motivation
Negotiation
Team building
Meetings
Recognition and rewards
Training
Virtual teams
09.5Manage Team
Inputs
Enterprise environmental factors
Organizational process assets
Project management plan
Resource management plan
Project documents
Issue log
Lessons learned register
Project team assignments
Team charter
Team performance assessments
Work performance reports
Outputs
Enterprise environmental factors updates
Project management plan updates
Cost baseline
Resource management plan
Schedule baseline
Project documents updates
Issue log
Lessons learned register
Project team assignments
Change requests
Tools & Techniques
Interpersonal and team skills
Conflict management
Decision making
Emotional intelligence
Influencing
Leadership
Project management information system
09 Project Resource Management
10.2Manage Communications
Inputs
Enterprise environmental factors
Organizational process assets
Project management plan
Communications management plan
Resource management plan
Stakeholder engagement plan
Project documents
Change log
Issue log
Lessons learned register
Quality report
Risk report
Stakeholder register
Work performance reports
Outputs
Organizational process assets updates
Project management plan updates
Communications management plan
Stakeholder engagement plan
Project documents updates
Issue log
Lessons learned register
Project schedule
Risk register
Stakeholder register
Project communications
Tools & Techniques
Communication methods
Communication skills
Communication competence
Feedback
Nonverbal
Presentations
Communication technology
Interpersonal and team skills
Active listening
Conflict management
Cultural awareness
Meeting management
Networking
Political awareness
Meetings
Project management information system
Project reporting
10 Project Communications Management
11.6Implement Risk Responses
Inputs
Organizational process assets
Project management plan
Risk management plan
Project documents
Lessons learned register
Risk register
Risk report
Outputs
Project documents updates
Issue log
Lessons learned register
Project team assignments
Risk register
Risk report
Change requests
Tools & Techniques
Expert judgment
Interpersonal and team skills
Influencing
Project management information system
11 Project Risk Management
12.2Conduct Procurements
Inputs
Enterprise environmental factors
Organizational process assets
Project management plan
Communications management plan
Configuration management plan
Cost baseline
Procurement management plan
Requirements management plan
Risk management plan
Scope management plan
Project documents
Lessons learned register
Project schedule
Requirements documentation
Risk register
Stakeholder register
Procurement documentation
Seller proposals
Outputs
Organizational process assets updates
Project management plan updates
Communications management plan
Cost baseline
Procurement management plan
Quality management plan
Requirements management plan
Risk management plan
Schedule baseline
Scope baseline
Project documents updates
Lessons learned register
Requirements documentation
Requirements traceability matrix
Resource calendars
Risk register
Stakeholder register
Agreements
Selected sellers
Change requests
Tools & Techniques
Advertising
Bidder conferences
Data analysis
Proposal evaluation
Expert judgment
Interpersonal and team skills
Negotiation
12 Project Procurement Management
13.3Manage Stakeholder Engagement
Inputs
Enterprise environmental factors
Organizational process assets
Project documents
Change log
Issue log
Lessons learned register
Stakeholder register
Project management plan
Change management plan
Communications management plan
Risk management plan
Stakeholder engagement plan
Outputs
Project management plan updates
Communications management plan
Stakeholder engagement plan
Project documents updates
Change log
Issue log
Lessons learned register
Stakeholder register
Change requests
Tools & Techniques
Communication skills
Feedback
Expert judgment
Ground rules
Interpersonal and team skills
Conflict management
Cultural awareness
Political awareness
Negotiation
Observation/conversation
Meetings
13 Project Stakeholder Management
Controling&Monitoring Group (Gate 1-4)
04.5Monitor and Control Project Work
Inputs
Enterprise environmental factors
Organizational process assets
Project management plan
Project documents
Milestone list
Cost forecasts
Schedule forecasts
Basis of estimates
Issue log
Assumption log
Risk register
Lessons learned register
Quality reports
Risk report
Agreements
Work performance reports
Outputs
Project documents updates
Cost forecasts
Schedule forecasts
Issue log
Risk register
Lessons learned register
Project management plan updates
Change requests
Work performance reports
Tools & Techniques
Data analysis
Alternatives analysis
Cost-benefit analysis
Earned value analysis
Root cause analysis
Trend analysis
Variance analysis
Decision making
Expert judgment
Meetings
04.6Perform Integrated Change Control
Inputs
Enterprise environmental factors
Organizational process assets
Project management plan
Change management plan
Configuration management plan
Cost baseline
Schedule baseline
Scope baseline
Project documents
Basis of estimates
Requirements traceability matrix
Risk report
Change requests
Work performance reports
Outputs
Approved change requests
Project documents updates
Change log
Project management plan updates
Tools & Techniques
Change control tools
Software?
Data analysis
Alternatives analysis
Cost-benefit analysis
Decision making
Autocratic decision making
Multicriteria decision analysis
Voting
Expert judgment
Meetings
04 Project Integration Management
05.5Validate Scope
Inputs
Project management plan
Requirements management plan
Scope management plan
Scope baseline
Project documents
Requirements documentation
Requirements traceability matrix
Lessons learned register
Quality reports
Work performance data
Verified deliverables
from 08.3 Control Quality
Outputs
Project documents updates
Lessons learned register
Requirements documentation
Requirements traceability matrix
Accepted deliverables
This is 'Acceptance' step prioro to "Close the project'
Change requests
Work performance information
Tools & Techniques
Decision making
Voting
Inspection
05.6Control Scope
Inputs
Organizational process assets
Project management plan
Change management plan
Configuration management plan
Performance measurement baseline
Requirements management plan
Scope management plan
Scope baseline
Project documents
Requirements documentation
Requirements traceability matrix
Lessons learned register
Work performance data
Outputs
Project management plan updates
Cost baseline
Performance measurement baseline
Schedule baseline
Scope baseline
Scope management plan
Project documents updates
Requirements documentation
Requirements traceability matrix
Lessons learned register
Change requests
Work performance information
Tools & Techniques
Data analysis
Trend analysis
Variance analysis
05 Project Scope Management
06.6Control Schedule
Inputs
Organizational process assets
Project management plan
Performance measurement baseline
Schedule baseline
Schedule management plan
Scope baseline
Project documents
Project calendars
Project schedule
Schedule data
Resource calendars
Lessons learned register
Work performance data
Outputs
Project management plan updates
Schedule baseline
Cost baseline
Performance measurement baseline
Schedule management plan
Project documents updates
Assumption log
Basis of estimates
Lessons learned register
Project schedule
Resource calendars
Risk register
Schedule data
Schedule forecasts
Change requests
Work performance information
Tools & Techniques
Critical path method
CPM
Data analysis
Earned value analysis
Iteration burndown chart
Performance reviews
Trend analysis
Variance analysis
What-if scenario analysis
Leads and lags
Project management information system
Resource optimization
Schedule compression
06 Project Schedule Management
07.4Control Costs
Inputs
Organizational process assets
Project management plan
Cost baseline
Cost management plan
Performance measurement baseline
Project documents
Lessons learned register
Project funding requirements
Work performance data
Outputs
Project management plan updates
Cost baseline
Cost management plan
Performance measurement baseline
Project documents updates
Assumption log
Basis of estimates
Cost estimates
Lessons learned register
Risk register
Change requests
Cost forecasts
Work performance information
Tools & Techniques
Data analysis
Earned value analysis
Reserve analysis
Trend analysis
Variance analysis
Expert judgment
Project management information system
To-complete performance index
07 Project Cost Management·
08.3 Control Quality
Inputs
Enterprise environmental factors
Organizational process assets
Project management plan
Quality management plan
Project documents
Lessons learned register
Quality metrics
Test and evaluation documents
Approved change requests
from 04.6Perform Integrated Change Control
Deliverables
Work performance data
Outputs
Project management plan updates
Quality management plan
Project documents updates
Risk register
Issue log
Lessons learned register
Test and evaluation documents
Change requests
Quality control measurements
Verified deliverables
This is QC step, after this, Go to 'Valdate Scope' as the input for 'Acceptance’
Work performance information
Tools & Techniques
Data analysis
Performance reviews
Root cause analysis
Data gathering
Check sheets
Checklists
Questionnaires and surveys
Statistical sampling
Data representation
Cause-and-effect diagrams
Control charts
Histogram
Scatter diagrams
Inspection
Meetings
Testing/product evaluations
08 Project Quality Management
09.6Control Resources
Inputs
Organizational process assets
Project management plan
Resource management plan
Project documents
Risk register
Issue log
Lessons learned register
Project schedule
Resource requirements
Physical resource assignments
Resource breakdown structure
Agreements
Work performance data
Outputs
Project management plan updates
Cost baseline
Schedule baseline
Resource management plan
Project documents updates
Risk register
Issue log
Assumption log
Lessons learned register
Physical resource assignments
Resource breakdown structure
Change requests
Work performance information
Tools & Techniques
Data analysis
Alternatives analysis
Cost-benefit analysis
Performance reviews
Trend analysis
Interpersonal and team skills
Influencing
Negotiation
Problem solving
Project management information system
09 Project Resource Management
10.3Monitor Communications
Inputs
Enterprise environmental factors
Organizational process assets
Project charter
Project management plan
Communications management plan
Resource management plan
Stakeholder engagement plan
Project documents
Issue log
Lessons learned register
Project communications
Outputs
Project management plan updates
Communications management plan
Stakeholder engagement plan
Project documents updates
Issue log
Lessons learned register
Stakeholder register
Change requests
Work performance information
Tools & Techniques
Data analysis
Stakeholder engagement assessment matrix
Expert judgment
Interpersonal and team skills
Meetings
Observation/conversation
Project management information system
10 Project Communications Management
11.7Monitor Risks
Inputs
Project management plan
Risk management plan
Project documents
Risk register
Risk report
Issue log
Lessons learned register
Work performance data
Work performance reports
Outputs
Organizational process assets
Project management plan updates
Project documents updates
Risk register
Risk report
Issue log
Assumption log
Lessons learned register
Change requests
Work performance information
Tools & Techniques
Audits
Data analysis
Reserve analysis
Technical performance analysis
Meetings
11 Project Risk Management
12.3Control Procurements
Inputs
Enterprise environmental factors
Organizational process assets
Project management plan
Change management plan
Procurement management plan
Requirements management plan
Risk management plan
Schedule baseline
Project documents
Assumption log
Lessons learned register
Milestone list
Quality reports
Requirements documentation
Requirements traceability matrix
Risk register
Stakeholder register
Procurement documentation
Agreements
Approved change requests
from 04.6Perform Integrated Change Control
Work performance data
Outputs
Organizational process assets updates
Procurement documentation updates
Project management plan updates
Cost baseline
Schedule baseline
Risk management plan
Procurement management plan
Project documents updates
Lessons learned register
Requirements traceability matrix
Resource requirements
Risk register
Stakeholder register
Closed procurements
Change requests
Work performance information
Tools & Techniques
Audits
Claims administration
Data analysis
Earned value analysis
Performance reviews
Trend analysis
Expert judgment
Inspection
12 Project Procurement Management
13.4Monitor Stakeholder Engagement
Inputs
Enterprise environmental factors
Organizational process assets
Project management plan
Communications management plan
Resource management plan
Stakeholder engagement plan
Project documents
Issue log
Risk register
Lessons learned register
Stakeholder register
Project communications
Work performance data
Outputs
Project management plan updates
Communications management plan
Resource management plan
Stakeholder engagement plan
Project documents updates
Issue log
Risk register
Lessons learned register
Stakeholder register
Change requests
Work performance information
Tools & Techniques
Communication skills
Feedback
Presentations
Data analysis
Alternatives analysis
Root cause analysis
Stakeholder analysis
Data representation
Stakeholder engagement assessment matrix
Decision making
Multicriteria decision analysis
Voting
Interpersonal and team skills
Active listening
Cultural awareness
Leadership
Networking
Political awareness
Meetings
13 Project Stakeholder Management
Closing Group - Gate 4
04.7Close Project or Phase
Inputs
Organizational process assets
Project management plan
Project documents
Assumption log
Basis of estimates
Change log
Issue log
Lessons learned register
Milestone list
Project communications
Quality control measurements
Quality reports
Requirements documentation
Risk register
Risk report
Business documents
Benefits management plan
Business case
Agreements
Procurement documentation
Project charter
Accepted deliverables
Outputs
Final product, service, or result transition
Final report
Organizational process assets updates
Project documents updates
Lessons learned register
Tools & Techniques
Data analysis
Document analysis
Regression analysis
Trend analysis
Variance analysis
Expert judgment
Meetings